For municipalities and engineers
Replace project-by-project qualification packages and manufacturer letters with independent, vendor-neutral certification you can check in seconds.
The system, contractor and crew lead are each verified by a third party, not by the vendor.
Any certified system and contractor qualifies, so the requirement is open and vendor-neutral.
A registry check replaces pages of experience lists and product letters.
Site-sample results across many owners show how each system and contractor performs.
Model specification clause
Free to use. Available in English and French, in formats for MasterSpec and provincial and municipal standard specifications.
QUALIFICATIONS A. The CIPP/SIPP system shall hold a current CertLiner System Certificate covering the proposed diameter range, thickness, cure method and service. B. The Contractor shall hold a current CertLiner Contractor Certificate for the proposed system and technique. C. Each installation shall be led on site by a crew lead named on the Contractor Certificate (or holding a CertLiner Crew Lead Certificate). D. The Owner will verify all certificates in the CertLiner public registry at bid and before installation. Suspended or expired certificates do not qualify. E. The Contractor shall register this project for the CertLiner site-verification program.
Start by giving certified bidders credit, and make certification mandatory once enough contractors in your market hold it.
Phase 1
Certification earns qualification points or replaces experience submittals.
Phase 2
Certified system and contractor required on new contracts.
Phase 3
Certified crew lead on site, with your jobs in the site-sample program.
A free member login to check the status, scope and expiry date of any certificate.
Model clauses, kept current as the scheme evolves.
Get notified if a contractor on your project is suspended.
Aggregated site-sample results by system and technique.
Owners hold seats on the scheme committee alongside engineers, installers and manufacturers. Founding members shape the first requirements and the spec language.